Exploration Potential
Drilling to date has identified laterite nickel mineralisation along a strike length of 6 kilometres. Further potential for mineralisation lies to the north and south of the resource area. There remains a further 8 kilometres of strike length of laterite geology over ultramafic bedrock, predominantly to the south of the resource area that has yet to be drill tested.
Existing GPR lines located on 400 metre line spacing covering a strike length of 2 kilometres to the south of the current drilling information indicates further substantial thicknesses of laterite profile exists. A wacker rig has commenced scout drilling of this area and will work towards the southern boundary of EL 1165 to assess the untested southern extents of the tenement.
Other related links: